Plan-aware bulk drafting
Create the phase’s remaining requests based on sampling and testing coverage.
Draft phase-specific population and sample requests from the plan, track each response, and preserve the line from population to sample to test and exception follow-up.
Control test · Interim
Journal entry approval
Approval evidence is dated before posting
Workbook · Sheet 1 · G14
Approver has delegated authority
Policy PDF · page 6
Exception receives documented follow-up
Sample 03 · follow-up draft
Lean teams feel every broken handoff because the same person often has to reconstruct the context.
Each step produces structured context for the next—so automation can act on the actual audit record.
Read remaining phase sample requirements from the plan.
Preview population or direct-sample requests in bulk.
Track sent, in-review, returned, and completed evidence.
Connect population, sample rows, files, and prior requests.
Create a human-reviewed request from eligible exceptions.
Every capability below is present in the current product; roadmap concepts are intentionally excluded.
Create the phase’s remaining requests based on sampling and testing coverage.
Choose the evidence path that matches how each control population is tested.
Attach files to individual samples and keep the population request linked.
Assign responsibility, delegate, comment, and review within the request.
Schedule or send reminders and reopen a response without losing history.
Draft the next external-safe request from failed test context for auditor approval.
IABuddy can draft samples from population files and draft follow-up language from eligible failed attributes. It does not send those decisions autonomously.
Control test · Interim
Journal entry approval
Approval evidence is dated before posting
Workbook · Sheet 1 · G14
Approver has delegated authority
Policy PDF · page 6
Exception receives documented follow-up
Sample 03 · follow-up draft
The plan calls for interim samples across selected months. The bulk preview creates the needed population and sample request drafts, assigns participants, and preserves planned quantities. When the population arrives, IABuddy drafts a traceable sample. One failed item becomes a follow-up draft tied to the original test and later retest.
PBC management is the process of requesting, receiving, reviewing, and tracking client-provided audit evidence. A connected PBC workflow also retains which population, sample, control, phase, and test the evidence supports.
Yes. IABuddy keeps test results tied to files, sample rows, and available page, sheet, or cell references so a reviewer can inspect the source in the workpaper workflow.
Continue exploring
Bring one control, one testing phase, or one evidence workflow. We’ll show you how it runs from plan to reviewed result.